Map of the Green Line Railway Project, Bang Wa-Samut Prakan Section
The Mass Rapid Transit Authority of Thailand (MRTA) was assigned to implement the Green Line railway project, Bearing–Samut Prakan section, with a distance of 13 km, all elevated, with 9 stations. The route begins by continuing from the Bangkok Mass Transit System (BTS) route, Sukhumvit Line Extension Phase 1, On Nut–Bearing section, at Sukhumvit 107 Alley (Bearing Alley), follows Sukhumvit Road, passing Theparak intersection, Pu Chao Saming Phraya intersection, and Sala Klong intersection, then turns left along Sukhumvit Road until reaching the Electricity Authority intersection, crossing Praksa Road, passing the wire intersection, ending in front of Bang Phing Substation.
- Agency:
- mrta
- Licence:
- Creative Commons Attributions
- Category:
- ข้อมูลสาธารณะ
- Geographic coverage:
- ประเทศ
- Update frequency:
- ไม่ทราบ
- Source portal:
- data_go_th
- Updated:
- 31/10/2021
English title machine-translated from the Thai original
Record last updated 1781 days ago
Data files (1)
- PDFGreenBaring4.0 MB
GreenBaring
Download →