MRTA (Map of the Silver Line Railway Project, Bang Khae-Phutthamonthon Line 4 Section)
The Silver Line railway project, Bang Khae–Phutthamonthon Line 4 section, has a total length of 8 kilometers and 4 stations. The route continues from the Silver Line railway project, Hua Lamphong–Bang Khae section, at Lat Song station. The route structure is elevated along the central median of Petchburi Road, crossing the Petchkasem–Phutthamonthon Line 2 intersection. Then, the route descends to pass under high-voltage power lines in front of Bang Na Power Plant, then ascends to Phutthamonthon Line 2 station and ascends further to cross the future Bangkok Metropolitan Administration (BMA) overpass project to Thawin station, maintaining the same level until the end of the project, passing Phutthamonthon Line 3 station, crossing the Petchkasem–Phutthamonthon Line 3 intersection and the future BMA overpass project, crossing the Ma Jern intersection (Petchkasem 81 Alley), crossing the future BMA overpass project, entering Phutthamonthon Line 4 station, which is the final station of the project.
- Agency:
- mrta
- Licence:
- Creative Commons Attributions
- Category:
- ข้อมูลสาธารณะ
- Geographic coverage:
- ประเทศ
- Update frequency:
- ไม่ทราบ
- Source portal:
- data_go_th
- Updated:
- 31/10/2021
English title machine-translated from the Thai original
Record last updated 1779 days ago
Data files (1)
- PDFblueline_พุทธมณฑล8.6 MB
blueline_พุทธมณฑล
Download →