Map of the Orange Line Railway Project, Taling Chan-Min Buri Section
The Orange Line railway project, Taling Chan–Minburi section, has a total distance of 39.8 kilometers, consisting of 30.6 kilometers of underground structure and 9.2 kilometers of elevated structure, with a total of 30 stations (23 underground stations and 7 elevated stations). It starts at Taling Chan station, then follows the route of the Bang Na Railway line, passing Siriraj Hospital, passing under the Chao Phraya River near Phra Pin Klao Bridge, passing under Ratchadamnoen Road, then turns to use the Lan Luang Road route, passing Yommarat, then enters the Petchburi Road route, turns left into Ratchaprarop Road to Din Daeng, then turns along Vibhavadi Rangsit Road, passing the Bangkok Administrative Court 2 (Din Daeng), turns right to connect with the MRT Chulalongkorn University Line at Thailand Cultural Center station, then turns into Rama 9 Road, crossing Pradit Manutham Road, turns left into Ramkhamhaeng Road, passing Lam Sali intersection, crossing Kanjanaphisek Road, ending at the intersection with Suwinthawong Road in the Minburi area.
- Agency:
- mrta
- Licence:
- Creative Commons Attributions
- Category:
- ข้อมูลสาธารณะ
- Geographic coverage:
- ประเทศ
- Update frequency:
- ไม่ทราบ
- Source portal:
- data_go_th
- Updated:
- 31/10/2021
English title machine-translated from the Thai original
Record last updated 1781 days ago
Data files (1)
- PDFOrangeLine1.4 MB
OrangeLine
Download →